
Kraków, 2013
Politechnika Krakowska
- Waterproofed area
- 232 m²
- System
- Hydrotech MM6125
- Works carried out
- November 2013
- Type of building
- Public buildings
Scope of work
What we did on this building
- Waterproofing of the flat roof in the Hydrotech MM6125 system for the MLBE building of Cracow University of Technology.
- 28 m² of waterproofing was completed.
About the building
Politechnika Krakowska
Laboratory and teaching building of the Lesser Poland Passive Building Laboratory at Cracow University of Technology
- Usable floor area
- 1,039.39 m²
- Storeys
- 5
ul. Szlak 42,
31-153 Kraków, Poland